Project / 01

Telehouse Hotel Dublin

Ecoaer completed ventilation and air distribution works at Telehouse Hotel Dublin, providing key ductwork components and associated fire safety elements as part of the building’s mechanical services installation.

Location
DUblin
Sector
Commercial
Client
Telehouse
Completed
Ducting, Grilles, Fire dampeners
Ecoaer scope
Installer
Replace with main Ecoaer project image
01 / Project overview

Engineered around the building.

Ecoaer completed the installation of ducting, air distribution grilles and fire dampers throughout the areas included within the project scope.

Units / zones
Mechanical services and ventilation areas within the development.
Project area:
Various internal areas requiring ducted ventilation, air distribution and fire-rated separation within the ventilation system.
Systems installed: 
Ductwork, ventilation grilles and fire dampers.
Delivery programme:
OFficial fitters
02 / The brief

What the project needed.

The project required a coordinated ventilation solution that could distribute air effectively throughout the relevant spaces while incorporating appropriate fire protection measures within the ductwork system.

03 / Ecoaer's response

How the system was delivered.

Ecoaer installed the required ductwork and air distribution grilles, together with fire dampers at relevant locations within the ventilation system. The installation was coordinated with surrounding services and building elements to ensure an efficient and integrated mechanical services solution.

04 / Technical scope

Project data.

System type
Mechanical ventilation and ducted air distribution system with integrated fire dampers.
Ecoaer services
Ductwork installation, air distribution grille installation and fire damper installation.
Air distribution
Air was distributed through the installed ductwork network and delivered to the relevant spaces through appropriately positioned grilles.
Special requirements
The inclusion of fire dampers required careful coordination at compartment boundaries and other designated locations to support the building’s fire safety strategy while maintaining the continuity of the ventilation system.
05 / Delivery
01

Design & review

System selection, drawing review, coordination and technical input.

02

Coordination

Integration with architecture, structure, electrical, ceilings and other services.

03

Installation

Site delivery, installation, quality control and programme management.

04

Commissioning

Balancing, testing, verification, client handover and ongoing support.

06 / Outcome

“A coordinated ventilation solution delivered to specification, commissioned for performance and integrated cleanly within the finished building.”

The result.

Ecoaer delivered a coordinated ventilation installation incorporating ductwork, grilles and fire dampers, providing effective air distribution while supporting the fire safety requirements of the building.