02 / The brief
What the project needed.
The Summer PI project required a mechanical ventilation solution serving multiple levels of a residential property. The specification called for two MVHR systems capable of providing balanced fresh air supply and extraction, with heat recovery to support efficient operation. The installation also required a coordinated ductwork arrangement incorporating distribution plenums, insulated ducting and air valves to accommodate the building's layout and ventilation requirements.
03 / Ecoaer's response
How the system was delivered.
The proposed Ecoaer scope covered the supply and installation of two Endura Delta MVHR systems and associated air distribution equipment. The specified package included semi-rigid and PVC ductwork, distribution plenums, insulated ducting, roof cowls, silencers, air valves and fire protection components. The ventilation arrangement was developed around the project drawings, with distribution routes serving the designated areas across the building's various levels.