Project / 01

Santander

Mechanical ventilation and ductwork package for Santander's Triton Square development in London, incorporating HVAC air distribution, volume control dampers, fire dampers, extraction components and associated ventilation fittings.

Location
UK
Sector
Commerical
Client
Santander
Completed
2024 Ventilation Works
Ecoaer scope
Mechanical ventilation works. 
Replace with main Ecoaer project image
01 / Project overview

Engineered around the building.

Various areas throughout the development requiring mechanical ventilation and coordinated air distribution.

Units / zones
Multiple Ventilation Areas
Project area:
Building
Systems installed: 
Mechanical Ventilation & Air Distribution Systems
Delivery programme:
Coordinated Mechanical Installation
02 / The brief

What the project needed.

The Santander Triton Square project required a coordinated mechanical ventilation solution to support the HVAC requirements of the building's commercial office areas. The specification covered ventilation distribution across Levels 3 and 4, incorporating flexible ductwork, volume control dampers, fire dampers and specialist extraction components. The works needed to accommodate the existing building layout, provide suitable airflow regulation and integrate with the wider mechanical services infrastructure.

03 / Ecoaer's response

How the system was delivered.

Ecoaer's scope included mechanical ventilation components and associated ductwork provisions, with specialist materials and installation requirements identified for the project. The package incorporated flexible ductwork, circular and rectangular dampers, extraction fan boxes, external louvres and supporting fittings. Additional ductwork elements included large rectangular sections, bends and mesh-ended connections. The proposed works also incorporated site measurement, supervision and specialist fitting labour to support coordination with the building's mechanical services requirements.

04 / Technical scope

Project data.

System type
Commercial HVAC Ventilation & Extraction
Ecoaer services
Ventilation Ductwork, Components & Installation Support
Air distribution
Flexible Ductwork, Dampers, Extraction Boxes & Louvres
Special requirements
Multi-Level HVAC Coordination, Fire Dampers & Specialist Extraction
05 / Delivery
01

Design & review

System selection, drawing review, coordination and technical input.

02

Coordination

Integration with architecture, structure, electrical, ceilings and other services.

03

Installation

Site delivery, installation, quality control and programme management.

04

Commissioning

Balancing, testing, verification, client handover and ongoing support.

06 / Outcome

“A coordinated ventilation solution delivered to specification, commissioned for performance and integrated cleanly within the finished building.”

The result.

The specified ventilation package provided a coordinated approach to the HVAC and extraction requirements of Santander Triton Square. The combination of ductwork, airflow control dampers, fire protection components and specialist extraction fittings was designed to support effective air distribution and ventilation across the designated areas. Ecoaer's involvement brought together the necessary mechanical components and installation provisions, supporting practical integration with the wider building services infrastructure and the operational requirements of a commercial office environment.