Project / 01

Royal Festival Hall Canteen

The Canteen at Royal Festival Hall is a stylish restaurant on London’s South Bank, where EcoAer delivered the kitchen and restaurant ventilation installation to a demanding opening deadline.

Location
South Bank
Sector
Commercial
Client
Royal Festival Hall
Completed
Full System
Ecoaer scope
Ventilation, Louves, diffusers, insulation
Replace with main Ecoaer project image
01 / Project overview

Engineered around the building.

Located within the iconic Royal Festival Hall, the Canteen combines a modern dining environment with a retro-inspired British food concept, requiring reliable ventilation across both the commercial kitchen and customer areas.

Units / zones
Commercial
Project area:
Restuarunt
Systems installed: 
Full ventilation system
Delivery programme:
OFficial installer
02 / The brief

What the project needed.

The restaurant required effective kitchen extract, balanced air distribution and fire-safe ventilation to manage heat, cooking fumes and odours while maintaining a comfortable dining environment.

03 / Ecoaer's response

How the system was delivered.

EcoAer installed fans, ductwork, volume controls, fire dampers, grilles, diffusers, louvres and insulation throughout the kitchen and restaurant areas, working to a very tight programme.

04 / Technical scope

Project data.

System type
Commercial kitchen extract and mechanical ventilation system.
Ecoaer services
Full ventilation installation for the kitchen and restaurant, including fans, ductwork, airflow controls, fire dampers, terminal devices, louvres and insulation.
Air distribution
Air was distributed and extracted through ductwork using grilles, diffusers and louvres, with volume controls used to balance airflow between the kitchen and dining spaces.
Special requirements
The key challenge was the tight deadline ahead of the grand opening, alongside the need for reliable kitchen extract, fire protection and comfortable airflow in a high-profile public venue.
05 / Delivery
01

Design & review

System selection, drawing review, coordination and technical input.

02

Coordination

Integration with architecture, structure, electrical, ceilings and other services.

03

Installation

Site delivery, installation, quality control and programme management.

04

Commissioning

Balancing, testing, verification, client handover and ongoing support.

06 / Outcome

“A coordinated ventilation solution delivered to specification, commissioned for performance and integrated cleanly within the finished building.”

The result.

EcoAer completed the ventilation installation on time, providing effective kitchen extraction, balanced airflow and a comfortable environment ready for the restaurant’s opening.