What the project needed.
The hotel required a reliable and energy-conscious ventilation system capable of providing fresh air, extracting stale air and supporting comfortable indoor conditions throughout bedrooms and shared spaces.
This 249-bedroom Hampton by Hilton hotel beside the Four Courts in Dublin required a complete, value-engineered ventilation solution, which EcoAer delivered in coordination with the developer and M&E contractors.

Developed by Seraphine Hotel Group and operated by Hampton by Hilton, the city-centre hotel combines a large number of guest bedrooms with communal, back-of-house and service areas, creating varied ventilation requirements across the building.
The hotel required a reliable and energy-conscious ventilation system capable of providing fresh air, extracting stale air and supporting comfortable indoor conditions throughout bedrooms and shared spaces.
EcoAer installed the complete ventilation systems and worked closely with the project team to develop a value-engineered solution, including the integration of Air Handling Units supplied with project partners.
System selection, drawing review, coordination and technical input.
Integration with architecture, structure, electrical, ceilings and other services.
Site delivery, installation, quality control and programme management.
Balancing, testing, verification, client handover and ongoing support.
“A coordinated ventilation solution delivered to specification, commissioned for performance and integrated cleanly within the finished building.”
EcoAer delivered a coordinated, cost-effective ventilation system that supports fresh air, guest comfort and reliable operation throughout the 249-bedroom hotel.