Project / 01

RDS Changing Facility

Ecoaer carried out specialist ventilation acoustic works at the RDS Players Changing Facility, installing sound attenuation equipment to support quieter operation of the mechanical ventilation system.

Location
Dublin
Sector
Leisure/sport
Client
RDS
Completed
Sound attenuation
Ecoaer scope
Installer
Replace with main Ecoaer project image
01 / Project overview

Engineered around the building.

Ecoaer installed a sound attenuator as part of the ventilation system serving the players’ changing facility.

Units / zones
Players’ changing and associated support areas.
Project area:
The mechanical ventilation system serving the changing facility.
Systems installed: 
Sound attenuator within the ventilation system.
Delivery programme:
The works were completed in coordination with the wider mechanical services and construction programme.
02 / The brief

What the project needed.

The facility required effective ventilation while limiting noise transfer from the mechanical system into occupied areas, helping maintain a comfortable environment for players and staff.

03 / Ecoaer's response

How the system was delivered.

Ecoaer installed the required sound attenuation component within the ventilation system to help reduce operational noise while allowing the necessary airflow to be maintained.

04 / Technical scope

Project data.

System type
Mechanical ventilation system with acoustic attenuation.
Ecoaer services
Supply and/or installation of ventilation sound attenuation equipment.
Air distribution
Airflow was maintained through the existing or associated ducted ventilation system, with the sound attenuator incorporated to reduce noise transmission.
Special requirements
The installation required careful integration within the available ductwork layout so that acoustic performance could be improved without unnecessarily restricting airflow or interfering with surrounding services.
05 / Delivery
01

Design & review

System selection, drawing review, coordination and technical input.

02

Coordination

Integration with architecture, structure, electrical, ceilings and other services.

03

Installation

Site delivery, installation, quality control and programme management.

04

Commissioning

Balancing, testing, verification, client handover and ongoing support.

06 / Outcome

“A coordinated ventilation solution delivered to specification, commissioned for performance and integrated cleanly within the finished building.”

The result.

The completed installation helped provide a quieter and more comfortable ventilation solution for the players’ changing facility while maintaining the required air movement through the system.