What the project needed.
The building required a large, well-coordinated ductwork installation capable of supporting ventilation across extensive factory and office spaces while fitting within the wider low-carbon building strategy.
McCormick & Co’s new 93,000 m² factory and office development is a major food-production facility designed as a future net zero carbon building, where EcoAer installed the ventilation ductwork.

Built on a 9.49-hectare site, the new facility combines large-scale spice production with modern office accommodation and was developed with a strong focus on energy efficiency and sustainability.
The building required a large, well-coordinated ductwork installation capable of supporting ventilation across extensive factory and office spaces while fitting within the wider low-carbon building strategy.
EcoAer installed the ventilation ductwork throughout the facility, coordinating the system across the production and office areas as part of the building’s mechanical services installation.
System selection, drawing review, coordination and technical input.
Integration with architecture, structure, electrical, ceilings and other services.
Site delivery, installation, quality control and programme management.
Balancing, testing, verification, client handover and ongoing support.
“A coordinated ventilation solution delivered to specification, commissioned for performance and integrated cleanly within the finished building.”
EcoAer delivered the ventilation ductwork for a major modern manufacturing facility, supporting effective air distribution while contributing to the wider building services strategy of the low-carbon development.