Project / 01

Pinewood Studios

Mechanical ventilation package for the Pinewood West development, incorporating ventilation infrastructure and associated air distribution systems to support the building's mechanical services requirements.

Location
UK
Sector
Commerical
Client
King & Moffatt
Completed
2021 Ventilation Works
Ecoaer scope
Mechanical ventilation works. 
Replace with main Ecoaer project image
01 / Project overview

Engineered around the building.

Various areas throughout the development requiring mechanical ventilation and coordinated air distribution.

Units / zones
Multiple Ventilation Areas
Project area:
Building
Systems installed: 
Mechanical Ventilation & Air Distribution Systems
Delivery programme:
Coordinated Mechanical Installation
02 / The brief

What the project needed.

The Pinewood West project required a comprehensive mechanical ventilation solution to support air circulation and distribution throughout the designated building areas. The proposed works needed to accommodate the development's layout while integrating with the wider mechanical services infrastructure. The ventilation package called for a coordinated approach to system installation, equipment connections and air distribution, ensuring compatibility with the building's operational requirements.

03 / Ecoaer's response

How the system was delivered.

Ecoaer prepared a mechanical ventilation package for King & Moffatt, covering the proposed ventilation works and associated project requirements. The scope incorporated mechanical ventilation services, installation planning and coordination with the wider building services programme. The package was developed through tender revisions to reflect project requirements and establish a structured approach to ventilation delivery across the designated areas.

04 / Technical scope

Project data.

System type
Industrial Mechanical Ventilation System
Ecoaer services
Mechanical Ventilation & Commissioning Provision

Air distribution
Mechanical Ventilation Ductwork Network
Special requirements
Temperature-Controlled Facility & Building Services Coordination
05 / Delivery
01

Design & review

System selection, drawing review, coordination and technical input.

02

Coordination

Integration with architecture, structure, electrical, ceilings and other services.

03

Installation

Site delivery, installation, quality control and programme management.

04

Commissioning

Balancing, testing, verification, client handover and ongoing support.

06 / Outcome

“A coordinated ventilation solution delivered to specification, commissioned for performance and integrated cleanly within the finished building.”

The result.

The proposed mechanical ventilation package provided a structured solution for the air distribution requirements of the Pinewood West development. The system was intended to support effective ventilation throughout the designated building areas while accommodating the practical demands of the wider mechanical services installation. Ecoaer's involvement established a defined ventilation scope, supporting coordinated project planning and integration with the building's mechanical infrastructure