Project / 01

National University of Ireland, Galway.
Student Accom

Ecoaer delivered a complete ventilation installation for the NUIG Student Accommodation development, providing a coordinated air distribution system designed to support comfortable and reliable ventilation throughout the building.

Location
Galway
Sector
Residential
Client
NUIG
Completed
Full Ventilation System
Ecoaer scope
Full Ventilation system
Replace with main Ecoaer project image
01 / Project overview

Engineered around the building.

Various areas throughout the student accommodation development requiring mechanical ventilation and coordinated air distribution.

Units / zones
Student bedrooms, communal areas, circulation spaces and associated service areas.
Various areas throughout the student accommodation development requiring mechanical ventilation and coordinated air distribution.
Systems installed: 
Full ventilation system
Delivery programme:
OFficial installer
02 / The brief

What the project needed.

The development required a reliable and efficient ventilation solution capable of maintaining effective air movement throughout residential and communal areas while integrating with the wider building services installation.

03 / Ecoaer's response

How the system was delivered.

Ecoaer installed the complete ventilation system across the designated areas, coordinating ductwork routes and air distribution components with the building layout and surrounding services to provide a practical and integrated solution

04 / Technical scope

Project data.

System type
Mechanical ventilation and ducted air distribution system.
Ecoaer services
Ductwork and ventilation installation, including fans, brackets, fixings and grilles.
Air distribution
Air was distributed through the installed ductwork system and terminated through appropriately positioned ventilation grilles serving the relevant spaces.
Special requirements
The project required careful coordination of the ventilation system within a multi-room residential environment, ensuring services could be integrated efficiently while maintaining a clean and unobtrusive finish throughout occupied areas.
05 / Delivery
01

Design & review

System selection, drawing review, coordination and technical input.

02

Coordination

Integration with architecture, structure, electrical, ceilings and other services.

03

Installation

Site delivery, installation, quality control and programme management.

04

Commissioning

Balancing, testing, verification, client handover and ongoing support.

06 / Outcome

“A coordinated ventilation solution delivered to specification, commissioned for performance and integrated cleanly within the finished building.”

The result.

Ecoaer delivered a complete and coordinated ventilation system for the NUIG Student Accommodation development, providing reliable air distribution and supporting a comfortable internal environment for students and building users.