Project / 01

Moore House Brighton

Supply of mechanical ventilation ductwork and associated air distribution components for Moore House in Brighton, incorporating spiral ductwork, airflow control dampers, insulated flexible ducting and ventilation grilles.

Location
Brighton, UK
Sector
Residential
Client
Private
Completed
Ventilation Supply Works
Ecoaer scope
Ductwork & Ventilation Component Supply
Replace with main Ecoaer project image
01 / Project overview

Engineered around the building.

Various areas throughout the development requiring mechanical ventilation and coordinated air distribution.

Units / zones
Multiple Ventilation Areas
Project area:
Residential Building
Systems installed: 
Spiral Ductwork, Dampers & Air Distribution Components
Delivery programme:
Phased Material Deliveries
02 / The brief

What the project needed.

The Moore House Brighton project required a mechanical ventilation ductwork package to support air distribution throughout the designated building areas. The specification included circular spiral ductwork, branch connections, airflow control dampers and insulated flexible ducting. The works also called for suitable ventilation grilles, fixing accessories and insulation materials to accommodate the building layout and support integration with the wider mechanical services infrastructure.

03 / Ecoaer's response

How the system was delivered.

Ecoaer's scope covered the coordinated supply of ventilation ductwork and associated components through two planned material deliveries. The first package included 100mm and 200mm spiral ductwork, 45-degree and 90-degree bends, saddle branches, butterfly volume control dampers, fire dampers and supporting accessories. The second delivery incorporated insulated flexible ductwork, grille boxes and swirl diffusers. The phased supply approach was arranged to support the progression of the ventilation installation and provide the required components for the designated building areas.


04 / Technical scope

Project data.

System type
Mechanical Ventilation & Air Distribution
Ecoaer services
Mechanical ventilation and Insulation Foil Wrapping

Air distribution
Spiral Ductwork, Flexible Ducting, Grilles & Swirl Diffusers
Special requirements
Phased Deliveries, Airflow Control & Ductwork Insulation
05 / Delivery
01

Design & review

System selection, drawing review, coordination and technical input.

02

Coordination

Integration with architecture, structure, electrical, ceilings and other services.

03

Installation

Site delivery, installation, quality control and programme management.

04

Commissioning

Balancing, testing, verification, client handover and ongoing support.

06 / Outcome

“A coordinated ventilation solution delivered to specification, commissioned for performance and integrated cleanly within the finished building.”

The result.

The specified ventilation package provided a coordinated selection of ductwork and air distribution components for Moore House Brighton. The combination of rigid spiral ductwork, flexible connections, dampers and ventilation terminals was designed to accommodate the building's air distribution requirements while allowing flexibility in installation. Ecoaer's involvement supported the organisation and supply of essential ventilation materials across planned delivery stages, providing a practical approach to servicing the project's mechanical ventilation requirements.