Project / 01

Lids Bluewater

Mechanical ventilation ductwork package for a facility at Heathrow, incorporating galvanised steel ductwork, air distribution components, volume control dampers and fire protection provisions.

Location
Kent, UK
Sector
Commercial
Client
Lids
Completed
ventilation installation
Ecoaer scope
Ductwork Supply & Installation


Replace with main Ecoaer project image
01 / Project overview

Engineered around the building.

Various areas throughout the development requiring mechanical ventilation and coordinated air distribution.

Units / zones
Retail unit
Project area:
Retail ventilation zone
Systems installed: 
FCU Ductwork, Ventilation Dampers & Air Distribution Grilles
Delivery programme:
Coordinated Site Installation
02 / The brief

What the project needed.

The Lids Bluewater project required a mechanical ventilation and air distribution solution suitable for a retail environment. The specification included ductwork connections to fan coil equipment, ventilation dampers and ceiling-mounted air distribution grilles. The works needed to accommodate the retail unit's layout and integrate with the wider building services infrastructure while providing suitable access for maintenance and airflow regulation.

03 / Ecoaer's response

How the system was delivered.

Ecoaer's scope covered the supply and installation of mechanical ventilation ductwork and associated components within the retail unit. The proposed package included circular and rectangular ductwork, bends, fan coil unit connections, plenums, fire dampers, volume control dampers and access doors. Eight ceiling grilles were included for installation, alongside supporting brackets and fixings. The ductwork arrangement was developed to accommodate the designated equipment connections and ceiling distribution points within the retail space.

04 / Technical scope

Project data.

System type
Fan Coil Unit Ventilation & Air Distribution
Ecoaer services
Ductwork Supply & Installation
Air distribution
Circular and Rectangular Ductwork with Ceiling Grilles
Special requirements
Retail Ceiling Coordination, Fire Dampers & Maintenance Access
05 / Delivery
01

Design & review

System selection, drawing review, coordination and technical input.

02

Coordination

Integration with architecture, structure, electrical, ceilings and other services.

03

Installation

Site delivery, installation, quality control and programme management.

04

Commissioning

Balancing, testing, verification, client handover and ongoing support.

06 / Outcome

“A coordinated ventilation solution delivered to specification, commissioned for performance and integrated cleanly within the finished building.”

The result.

The specified ventilation package provided a coordinated air distribution solution for the Lids retail unit at Bluewater Shopping Centre. The combination of fan coil unit connections, ductwork distribution, airflow control dampers and ceiling grilles was designed to support effective air circulation throughout the designated retail areas. Ecoaer's scope addressed the practical requirements of integrating ventilation services within the retail fit-out, supporting a functional and maintainable mechanical services arrangement.