Project / 01

Lidl Belvedere

Ecoaer completed the installation of the full ventilation system, including ductwork, fire dampers, air distribution grilles, brackets and associated fixings.

Location
Belvedere
Sector
Commercial 
Client
Lidl
Completed
Full Ventilation System
Ecoaer scope
Full Ventilation system
Replace with main Ecoaer project image
01 / Project overview

Engineered around the building.

Various areas throughout the development requiring mechanical ventilation and coordinated air distribution.

Units / zones
Full ventilation system, ductwork, fire dampers, grilles, support brackets and fixings.
Project area:
Various areas throughout the store requiring mechanical ventilation and air distribution services.
Systems installed: 
Full ventilation system
Delivery programme:
OFficial installer
02 / The brief

What the project needed.

The project required a complete and reliable ventilation solution capable of providing effective air movement throughout the building while also incorporating the necessary fire protection measures and structural support for the ductwork system.

03 / Ecoaer's response

How the system was delivered.

Ecoaer installed the complete ventilation network, including ductwork, grilles and associated support systems. Fire dampers were incorporated at the required locations to support the building’s fire safety strategy, while brackets and fixings provided a secure and coordinated installation.

04 / Technical scope

Project data.

System type
Mechanical ventilation and ducted air distribution system.
Ecoaer services
Ductwork and ventilation installation, including fans, brackets, fixings and grilles.
Air distribution
Air was distributed through the installed ductwork system and terminated through appropriately positioned ventilation grilles serving the relevant spaces.
Special requirements
The installation required careful coordination with the building layout and other mechanical, electrical and architectural elements, particularly within areas where services needed to be integrated discreetly into the finished store environment.
05 / Delivery
01

Design & review

System selection, drawing review, coordination and technical input.

02

Coordination

Integration with architecture, structure, electrical, ceilings and other services.

03

Installation

Site delivery, installation, quality control and programme management.

04

Commissioning

Balancing, testing, verification, client handover and ongoing support.

06 / Outcome

“A coordinated ventilation solution delivered to specification, commissioned for performance and integrated cleanly within the finished building.”

The result.

Ecoaer delivered a complete and coordinated ventilation system for Lidl Belvedere, providing effective air distribution, integrated fire protection and a robust installation suited to the requirements of a modern retail environment.