Kosher Deli Factory in Luton is a large food-production facility where EcoAer installed a complete ventilation and climate-control system using three Air Handling Units.

Location
Luton
Sector
Industrial
Client
Kosher Deli
Completed
Full System
Ecoaer scope
Ventilation, Louves, diffusers, insulation
Replace with main Ecoaer project image
01 / Project overview

Engineered around the building.

The Luton factory supports the UK’s largest kosher butcher and deli operation, supplying meat and produce to five deli locations across London.

Units / zones
Industrial
Project area:
Factory
Systems installed: 
Full ventilation system
Delivery programme:
OFficial installer
02 / The brief

What the project needed.

The factory and office areas required reliable fresh-air ventilation together with heating and cooling to maintain suitable indoor conditions across both production and occupied spaces.

03 / Ecoaer's response

How the system was delivered.

EcoAer installed three AHUs along with fans, ductwork, volume control devices, fire dampers, grilles, diffusers, louvres and insulation throughout the factory and offices.

04 / Technical scope

Project data.

System type
Centralised mechanical ventilation and air-conditioning system using three Air Handling Units (AHUs).
Ecoaer services
Full installation of AHUs, fans, ductwork, airflow controls, fire dampers, grilles, diffusers, louvres and insulation.
Air distribution
Fresh and conditioned air was distributed through ductwork to the factory and office areas using grilles, diffusers and louvres, with volume controls used to balance airflow.
Special requirements
As a food-production facility, the system needed to provide reliable fresh air, stable temperature conditions, good airflow management and appropriate fire protection across both factory and office environments.
05 / Delivery
01

Design & review

System selection, drawing review, coordination and technical input.

02

Coordination

Integration with architecture, structure, electrical, ceilings and other services.

03

Installation

Site delivery, installation, quality control and programme management.

04

Commissioning

Balancing, testing, verification, client handover and ongoing support.

06 / Outcome

“A coordinated ventilation solution delivered to specification, commissioned for performance and integrated cleanly within the finished building.”

The result.

EcoAer delivered a complete ventilation, heating and cooling solution that provided fresh air, controlled temperatures and balanced airflow throughout the new factory and offices.