What the project needed.
The existing ventilation system had aged and required upgrading to improve reliability, airflow, fire protection and overall comfort for guests and staff.
Hilton Gatwick underwent a major refurbishment in which EcoAer upgraded the hotel’s ventilation infrastructure, replacing key ductwork and air-distribution components to modernise performance and safety.

Located at Gatwick Airport’s South Terminal, the long-established Hilton hotel required renovation to bring its building services in line with the newly refurbished interiors and the expectations of a modern airport hotel.
The existing ventilation system had aged and required upgrading to improve reliability, airflow, fire protection and overall comfort for guests and staff.
EcoAer refurbished the ventilation installation by replacing sections of ductwork, fire-rated ducting, grilles and diffusers throughout the hotel.
System selection, drawing review, coordination and technical input.
Integration with architecture, structure, electrical, ceilings and other services.
Site delivery, installation, quality control and programme management.
Balancing, testing, verification, client handover and ongoing support.
“A coordinated ventilation solution delivered to specification, commissioned for performance and integrated cleanly within the finished building.”
The hotel was left with a modernised ventilation system that better supports guest comfort, reliable operation and fire safety alongside the wider interior refurbishment.