Project / 01

Hilton Hotel

Hilton Gatwick underwent a major refurbishment in which EcoAer upgraded the hotel’s ventilation infrastructure, replacing key ductwork and air-distribution components to modernise performance and safety.

Location
Gatwick
Sector
Residential/Commercial
Client
Hilton Hotel
Completed
Full System
Ecoaer scope
Ventilation System
Replace with main Ecoaer project image
01 / Project overview

Engineered around the building.

Located at Gatwick Airport’s South Terminal, the long-established Hilton hotel required renovation to bring its building services in line with the newly refurbished interiors and the expectations of a modern airport hotel.

Units / zones
Commercial and residential
Project area:
Gatwick
Systems installed: 
Full ventilation system
Delivery programme:
OFficial installer
02 / The brief

What the project needed.

The existing ventilation system had aged and required upgrading to improve reliability, airflow, fire protection and overall comfort for guests and staff.

03 / Ecoaer's response

How the system was delivered.

EcoAer refurbished the ventilation installation by replacing sections of ductwork, fire-rated ducting, grilles and diffusers throughout the hotel.

04 / Technical scope

Project data.

System type
Refurbished commercial mechanical ventilation system with fire-rated ductwork.
Ecoaer services
Ventilation refurbishment, ductwork replacement, fire-duct upgrades and replacement of grilles and diffusers.
Air distribution
Air was distributed through the renewed ductwork network, with updated grilles and diffusers helping provide more effective and consistent airflow to occupied areas.
Special requirements
Specific standards are not listed, but the refurbishment would typically need to meet relevant UK requirements for ventilation, fire safety, fire-rated ductwork and commercial building services.
05 / Delivery
01

Design & review

System selection, drawing review, coordination and technical input.

02

Coordination

Integration with architecture, structure, electrical, ceilings and other services.

03

Installation

Site delivery, installation, quality control and programme management.

04

Commissioning

Balancing, testing, verification, client handover and ongoing support.

06 / Outcome

“A coordinated ventilation solution delivered to specification, commissioned for performance and integrated cleanly within the finished building.”

The result.

The hotel was left with a modernised ventilation system that better supports guest comfort, reliable operation and fire safety alongside the wider interior refurbishment.