Project / 01

Hilton Food Group Plc

Darby’s is a premium restaurant within Embassy Gardens, where EcoAer delivered a complete commercial ventilation installation supporting the kitchen, dining areas and specialist cooking operations.

Location
 Huntingdon, Cambridgeshire

Sector
Industrial
Client
Hilton Food Group Plc
Completed
Full System
Ecoaer scope
Ventilation, Louves, diffusers, insulation
Replace with main Ecoaer project image
01 / Project overview

Engineered around the building.

Hilton Food Group operates large-scale meat packing facilities across Europe, with its Huntingdon site forming part of its long-established food production network.

Units / zones
Industrial
Project area:
Factory
Systems installed: 
Full ventilation system
Delivery programme:
OFficial installer
02 / The brief

What the project needed.

The facility required a robust and hygienic ventilation system capable of supporting a busy food-processing environment, maintaining effective airflow and helping provide safe, comfortable working conditions.

03 / Ecoaer's response

How the system was delivered.

EcoAer supplied and installed the full ventilation package, including fans, ductwork, volume control devices, fire dampers, grilles, diffusers, louvres and insulation.

04 / Technical scope

Project data.

System type
Large-scale industrial mechanical ventilation system.
Ecoaer services
Complete installation of fans, ductwork, airflow-control equipment, fire dampers, grilles, diffusers, louvres and insulation.
Air distribution
Air was distributed throughout the facility via a ducted network, using grilles, diffusers and louvres, with volume control devices helping balance airflow across different areas.
Special requirements
As a meat-packing facility, the system needed to support a hygienic food-production environment, provide reliable ventilation, manage heat and odours, and integrate appropriate fire-safety measures.
05 / Delivery
01

Design & review

System selection, drawing review, coordination and technical input.

02

Coordination

Integration with architecture, structure, electrical, ceilings and other services.

03

Installation

Site delivery, installation, quality control and programme management.

04

Commissioning

Balancing, testing, verification, client handover and ongoing support.

06 / Outcome

“A coordinated ventilation solution delivered to specification, commissioned for performance and integrated cleanly within the finished building.”

The result.

EcoAer delivered a complete, reliable ventilation system that provided controlled air distribution and supported safe, hygienic and comfortable working conditions throughout the facility.