Project / 01

Heathrow

Mechanical ventilation ductwork package for a facility at Heathrow, incorporating galvanised steel ductwork, air distribution components, volume control dampers and fire protection provisions.

Location
Heathrow London
Sector
Aviation
Client
Private
Completed
ventilation installation
Ecoaer scope
Ductwork Supply & Installation


Replace with main Ecoaer project image
01 / Project overview

Engineered around the building.

Various areas throughout the development requiring mechanical ventilation and coordinated air distribution.

Units / zones
Ground Floor Ventilation
Project area:
Ground Floor Areas
Systems installed: 
Galvanised Steel Ventilation Ductwork & Dampers
Delivery programme:
Coordinated Site Installation
02 / The brief

What the project needed.

The Heathrow project required a mechanical ventilation ductwork solution to support air distribution across the designated ground floor areas. The specification included circular spiral and rectangular galvanised steel ductwork, with various bends, fittings and connections to accommodate the building layout. The proposed works also required volume control dampers, fire dampers and access provisions to support airflow management, maintenance and integration with the wider mechanical services installation.


03 / Ecoaer's response

How the system was delivered.

Ecoaer's proposed scope covered the supply and installation of galvanised steel ventilation ductwork and associated components. The package included circular spiral ductwork ranging from 100mm to 500mm in diameter, alongside rectangular ductwork in various sizes, bends and transitions. Volume control dampers, access doors, fire dampers and supporting brackets were incorporated into the specification. Site access equipment, material storage and delivery arrangements were also considered to support the planned installation activities.

04 / Technical scope

Project data.

System type
Mechanical Ventilation & Air Distribution
Ecoaer services
Galvanised Ductwork Supply & Installation
Air distribution
Circular Spiral & Rectangular Galvanised Steel Ductwork
Special requirements
Fire Dampers, Airflow Regulation & Site Access Coordination
05 / Delivery
01

Design & review

System selection, drawing review, coordination and technical input.

02

Coordination

Integration with architecture, structure, electrical, ceilings and other services.

03

Installation

Site delivery, installation, quality control and programme management.

04

Commissioning

Balancing, testing, verification, client handover and ongoing support.

06 / Outcome

“A coordinated ventilation solution delivered to specification, commissioned for performance and integrated cleanly within the finished building.”

The result.

The specified ventilation package provided a structured approach to the ground floor air distribution requirements at Heathrow. The combination of circular and rectangular ductwork, airflow control dampers and associated fittings was designed to accommodate the building configuration while supporting effective ventilation distribution. Ecoaer's scope brought together the ductwork materials, installation requirements and site logistics needed to support integration with the wider building services infrastructure.