Project / 01

Mandarin Hotel

The Mandarin Hotel is a high-end central London hotel where EcoAer delivered the complete basement and car park ventilation package, including specialist fire-rated ductwork systems.

Location
London
Sector
Residential/Commercial
Client
Hannover Square
Completed
Full System
Ecoaer scope
Ventilation System
Replace with main Ecoaer project image
01 / Project overview

Engineered around the building.

Located in the heart of London near Oxford Circus and Soho, the hotel required robust building services to support its basement and parking areas while maintaining the high safety and performance standards expected of a premium hospitality development.

Units / zones
Commercial and residential
Project area:
Hannover Square
Systems installed: 
Full ventilation system
Delivery programme:
OFficial installer
02 / The brief

What the project needed.

The basement and car park areas required dependable mechanical ventilation to remove stale air and vehicle pollutants, together with fire-rated ductwork to support the building’s smoke and fire-safety strategy.

03 / Ecoaer's response

How the system was delivered.

EcoAer worked with specialist partners to manufacture and install the fire ducting systems and complete the ventilation installation throughout the basement and parking areas.

04 / Technical scope

Project data.

System type
Commercial basement and car park mechanical ventilation system incorporating fire-rated ductwork.
Ecoaer services
Manufacture, supply and installation of specialist fire ducting, together with installation of the complete ventilation system serving the basement and parking areas.
Air distribution
Air was supplied and extracted through a dedicated ductwork network designed to ventilate enclosed lower-ground spaces and remove contaminated air from the car park.
Special requirements
The enclosed basement and parking environment required effective pollutant extraction, reliable airflow and fire-resistant ductwork capable of maintaining performance under emergency conditions.
05 / Delivery
01

Design & review

System selection, drawing review, coordination and technical input.

02

Coordination

Integration with architecture, structure, electrical, ceilings and other services.

03

Installation

Site delivery, installation, quality control and programme management.

04

Commissioning

Balancing, testing, verification, client handover and ongoing support.

06 / Outcome

“A coordinated ventilation solution delivered to specification, commissioned for performance and integrated cleanly within the finished building.”

The result.

EcoAer delivered a robust ventilation and fire-ducting solution that supported safe air quality, effective extraction and enhanced fire protection throughout the hotel’s basement and parking areas.