Hampton by Hilton Hotel Ealing

This large-scale development required a complete, value-engineered ventilation solution, with EcoAer delivering fire-rated ductwork, kitchen extract, room and corridor ventilation, insulation and associated air-distribution equipment.

Location
Ealing
Sector
Residential/Commercial
Client
Hotel
Completed
Full System
Ecoaer scope
Ventilation, Louves, diffusers, insulation
Replace with main Ecoaer project image
01 / Project overview

Engineered around the building.

The project involved a comprehensive ventilation package serving multiple areas of the building, from kitchens and occupied rooms to communal corridors, with close coordination between EcoAer, the developer and the M&E contractor.

Units / zones
Residential
Commercial
Project area:
Earling
Systems installed: 
Full ventilation system
Delivery programme:
OFficial installer
02 / The brief

What the project needed.

The development required reliable ventilation for large-volume warehouse spaces and associated offices, with effective airflow control, fire safety and comfortable internal conditions.

03 / Ecoaer's response

How the system was delivered.

EcoAer worked closely with the project team to develop a value-engineered solution, selecting and installing suitable equipment including Air Handling Units, ductwork, fire ducts, grilles, diffusers, volume controllers and insulation.

04 / Technical scope

Project data.

System type
Centralised mechanical supply and extract ventilation system, incorporating AHUs, kitchen extract ventilation and fire-rated ductwork.
Ecoaer services
Complete ventilation installation, including fire ductwork, kitchen ventilation, room and corridor ventilation, lagging, AHUs, grilles, diffusers and airflow-control equipment.
Air distribution
Conditioned and fresh air was distributed through ductwork to rooms and corridors using grilles and diffusers, with extract systems removing stale or contaminated air from kitchens and other designated areas.
Special requirements
The project required value engineering, careful coordination with the developer and M&E contractor, fire-rated ventilation routes, specialist kitchen extract and effective integration of multiple ventilation systems within the building.
05 / Delivery
01

Design & review

System selection, drawing review, coordination and technical input.

02

Coordination

Integration with architecture, structure, electrical, ceilings and other services.

03

Installation

Site delivery, installation, quality control and programme management.

04

Commissioning

Balancing, testing, verification, client handover and ongoing support.

06 / Outcome

“A coordinated ventilation solution delivered to specification, commissioned for performance and integrated cleanly within the finished building.”

The result.

EcoAer delivered a coordinated and cost-effective ventilation package designed to provide reliable airflow, effective extract, fire protection and comfortable internal conditions throughout the development.