What the project needed.
The site required high-capacity ventilation, controlled air distribution, fire protection and specialist extraction to remove glue fumes and odours generated by the book-printing machinery.
This 29,000 m² fulfilment centre in Dunstable required a large-scale industrial ventilation and specialist extraction solution, which EcoAer delivered across the 20+ metre-high facility.

Opened in 2015, the fulfilment centre is a major industrial facility that also houses an on-demand book-printing operation, creating demanding ventilation requirements across both warehouse and production areas.
The site required high-capacity ventilation, controlled air distribution, fire protection and specialist extraction to remove glue fumes and odours generated by the book-printing machinery.
EcoAer installed the main ventilation system, including ductwork, volume control, fire dampers, grilles, diffusers, louvres and insulation, using specially designed fixing solutions suitable for the building’s height.
System selection, drawing review, coordination and technical input.
Integration with architecture, structure, electrical, ceilings and other services.
Site delivery, installation, quality control and programme management.
Balancing, testing, verification, client handover and ongoing support.
“A coordinated ventilation solution delivered to specification, commissioned for performance and integrated cleanly within the finished building.”
EcoAer delivered a robust, high-capacity ventilation and extraction system that provided controlled airflow, effective removal of printing fumes and odours, improved acoustic performance and safe ventilation throughout the large fulfilment centre.