Project / 01

Sofitel Dublin Airport

Ecoaer carried out ventilation installation works at Sofitel Hotel Dublin Airport, providing key components of the air distribution system including ductwork, plenums and sound attenuation equipment.

Location
Dublin
Sector
Commercial
Client
Dublin Airport Sofitel
Completed
Full ventilation system, attenuator, plenums
Ecoaer scope
Installer
Replace with main Ecoaer project image
01 / Project overview

Engineered around the building.

Ecoaer completed the installation of ductwork, ventilation plenums and sound attenuators within the designated project areas.

Units / zones
Mechanical ventilation and air distribution areas within the airport development.
Project area:
Areas requiring coordinated ducted ventilation and acoustic control as part of the wider mechanical services installation.
Systems installed: 
Ductwork, ventilation plenums and sound attenuators.
Delivery programme:
The works were completed in coordination with the wider mechanical services and construction programme.
02 / The brief

What the project needed.

The project required a coordinated air distribution solution capable of moving air effectively through the relevant spaces while also helping control noise generated or transmitted through the ventilation system.

03 / Ecoaer's response

How the system was delivered.

Ecoaer installed the required ductwork network together with plenums and sound attenuators, creating a coordinated ventilation arrangement suited to the operational requirements of the project areas.

04 / Technical scope

Project data.

System type
Mechanical ventilation and ducted air distribution system with acoustic attenuation.
Ecoaer services
Ductwork installation, plenum installation and sound attenuator installation.
Air distribution
Air was distributed through the installed ductwork and plenum system, providing an organised route for supply and extract air throughout the relevant areas.
Special requirements
Working within an airport environment required careful coordination with surrounding services, restricted installation spaces and the wider project programme. The inclusion of sound attenuators also required consideration of acoustic performance while maintaining appropriate airflow.
05 / Delivery
01

Design & review

System selection, drawing review, coordination and technical input.

02

Coordination

Integration with architecture, structure, electrical, ceilings and other services.

03

Installation

Site delivery, installation, quality control and programme management.

04

Commissioning

Balancing, testing, verification, client handover and ongoing support.

06 / Outcome

“A coordinated ventilation solution delivered to specification, commissioned for performance and integrated cleanly within the finished building.”

The result.

Ecoaer delivered a coordinated ventilation installation incorporating ductwork, plenums and acoustic attenuation, supporting effective air distribution and quieter operation within the completed project areas.