Project / 01

Distribution warehouse Graben

One of Bavaria’s largest distribution centres required a high-capacity smoke control solution, with EcoAer installing more than 50 large-diameter smoke ventilation systems across the facility.

Location
Germany
Sector
Industrial
Client
Amazon
Completed
Full System
Ecoaer scope
Smoke ventilation System
Replace with main Ecoaer project image
01 / Project overview

Engineered around the building.

The distribution centre is a major logistics hub in Bayern, handling products for onward distribution throughout Europe and requiring robust life-safety systems suited to a large industrial building.

Units / zones
Industrial
Project area:
Facility
Systems installed: 
Full ventilation system
Delivery programme:
OFficial installer
02 / The brief

What the project needed.

The facility required effective fire and smoke control ventilation capable of extracting smoke during an emergency, protecting escape routes and supporting safe evacuation and firefighting operations.

03 / Ecoaer's response

How the system was delivered.

EcoAer installed more than 50 large-diameter smoke ventilation systems, coordinating the equipment across the extensive warehouse to provide effective smoke extraction coverage.

04 / Technical scope

Project data.

System type
Large-scale mechanical smoke extract and fire ventilation system.
Ecoaer services
Installation of smoke ventilation equipment and associated large-diameter ventilation systems throughout the distribution centre.
Air distribution
In fire conditions, smoke and hot gases are mechanically extracted through dedicated high-capacity ventilation routes, helping limit smoke accumulation within the warehouse.
Special requirements
The large scale and height of the distribution environment required high-capacity equipment, extensive coverage, reliable emergency operation and careful integration with the building’s fire strategy.
05 / Delivery
01

Design & review

System selection, drawing review, coordination and technical input.

02

Coordination

Integration with architecture, structure, electrical, ceilings and other services.

03

Installation

Site delivery, installation, quality control and programme management.

04

Commissioning

Balancing, testing, verification, client handover and ongoing support.

06 / Outcome

“A coordinated ventilation solution delivered to specification, commissioned for performance and integrated cleanly within the finished building.”

The result.

EcoAer delivered a substantial smoke-control installation that strengthened the building’s fire-safety strategy and provided reliable smoke extraction across one of the region’s largest distribution facilities.