What the project needed.
The facility required a reliable mechanical ventilation solution to provide fresh air, remove stale air and maintain suitable working conditions throughout the warehouse.
This 1,000 m² fulfilment centre near Dublin is a modern distribution facility where EcoAer installed the complete ventilation ductwork and associated ventilation systems.

Opened in 2021, the new warehouse was developed to support efficient fulfilment and distribution operations within a modern industrial environment.
The facility required a reliable mechanical ventilation solution to provide fresh air, remove stale air and maintain suitable working conditions throughout the warehouse.
EcoAer installed the ventilation ductwork and associated system components, coordinating the installation to suit the layout and operational requirements of the new fulfilment centre.
System selection, drawing review, coordination and technical input.
Integration with architecture, structure, electrical, ceilings and other services.
Site delivery, installation, quality control and programme management.
Balancing, testing, verification, client handover and ongoing support.
“A coordinated ventilation solution delivered to specification, commissioned for performance and integrated cleanly within the finished building.”
EcoAer delivered a dependable ventilation installation that supported good indoor air quality and comfortable working conditions throughout the new Dublin fulfilment centre.