Project / 01

DHL – Level 02

Mechanical ventilation ductwork package for Level 02 of a DHL facility, incorporating ductwork connections, inline ventilation equipment and air distribution components for designated comfort cooling and ventilation areas.

Location
Ireland
Sector
Logistics
Client
DHL
Completed
ventilation installation
Ecoaer scope
Ductwork & Inline Equipment Installation
Replace with main Ecoaer project image
01 / Project overview

Engineered around the building.

Various areas throughout the development requiring mechanical ventilation and coordinated air distribution.

Units / zones
2 Ventilation zones
Project area:
Logistics
Level 2
Systems installed: 
FCU Ductwork, Ventilation Ductwork & Inline Components
Delivery programme:
Coordinated Mechanical Installation
02 / The brief

What the project needed.

The DHL Level 02 project required a coordinated mechanical ductwork solution to support the building's comfort cooling and ventilation systems. The specification covered separate ductwork arrangements for fan coil units and general ventilation, with associated inline equipment and air distribution components. The proposed installation needed to accommodate the existing building layout, integrate with the wider mechanical services infrastructure and provide suitable connections between the ventilation equipment and designated areas.

03 / Ecoaer's response

How the system was delivered.

Ecoaer's scope covered the supply and installation of ductwork and inline components for the Level 02 comfort cooling and ventilation systems. The proposed works included fan coil unit ductwork connections, ventilation ductwork, associated inline equipment and seven lined plenums. The package was developed around the project drawings, with installation activities planned to coordinate with the wider mechanical services programme and accommodate the building's ventilation distribution requirements.

04 / Technical scope

Project data.

System type
Mechanical Ventilation & Comfort Cooling Air Distribution
Ecoaer services
Ductwork Supply & Installation
Air distribution
FCU Connections, Ventilation Ductwork & Lined Plenums
Special requirements
Level 02 Services Coordination & Equipment Integration
05 / Delivery
01

Design & review

System selection, drawing review, coordination and technical input.

02

Coordination

Integration with architecture, structure, electrical, ceilings and other services.

03

Installation

Site delivery, installation, quality control and programme management.

04

Commissioning

Balancing, testing, verification, client handover and ongoing support.

06 / Outcome

“A coordinated ventilation solution delivered to specification, commissioned for performance and integrated cleanly within the finished building.”

The result.

The specified ductwork package provided a coordinated air distribution solution for the comfort cooling and mechanical ventilation requirements of DHL Level 02. The combination of dedicated ductwork connections, inline equipment and lined plenums was designed to support effective airflow distribution while accommodating the building's mechanical services layout. Ecoaer's involvement established a defined installation package supporting the integration of ventilation and comfort cooling services within the facility.