Mechanical ventilation ductwork package for Level 02 of a DHL facility, incorporating ductwork connections, inline ventilation equipment and air distribution components for designated comfort cooling and ventilation areas.

Engineered around the building.
2 Ventilation zones
Logistics
Level 2
FCU Ductwork, Ventilation Ductwork & Inline Components
Coordinated Mechanical Installation
How the system was delivered.
Ecoaer's scope covered the supply and installation of ductwork and inline components for the Level 02 comfort cooling and ventilation systems. The proposed works included fan coil unit ductwork connections, ventilation ductwork, associated inline equipment and seven lined plenums. The package was developed around the project drawings, with installation activities planned to coordinate with the wider mechanical services programme and accommodate the building's ventilation distribution requirements.
Project data.
Design & review
System selection, drawing review, coordination and technical input.
Coordination
Integration with architecture, structure, electrical, ceilings and other services.
Installation
Site delivery, installation, quality control and programme management.
Commissioning
Balancing, testing, verification, client handover and ongoing support.
“A coordinated ventilation solution delivered to specification, commissioned for performance and integrated cleanly within the finished building.”
The result.
The specified ductwork package provided a coordinated air distribution solution for the comfort cooling and mechanical ventilation requirements of DHL Level 02. The combination of dedicated ductwork connections, inline equipment and lined plenums was designed to support effective airflow distribution while accommodating the building's mechanical services layout. Ecoaer's involvement established a defined installation package supporting the integration of ventilation and comfort cooling services within the facility.