01 / Project overview

Engineered around the building.

Ecoaer completed the installation of PVC ducting, air brick adaptors, Jubilee clips, louvres and fire-rated ductwork within the areas included in the project scope.

Units / zones
Residential apartments and associated ventilation service areas.
Project area:
Various areas throughout the development requiring ducted ventilation, external air connections and fire-rated ventilation routes.
Systems installed: 
PVC ducting, air brick adaptors, Jubilee clips, ventilation louvres and fire-rated ductwork.
Delivery programme:
The works were completed in coordination with the wider mechanical services and construction programme.
02 / The brief

What the project needed.

The development required a practical and coordinated ventilation solution for residential spaces, including secure duct connections, external air terminations and fire-rated ductwork where required by the building layout.

03 / Ecoaer's response

How the system was delivered.

Ecoaer installed the required PVC ducting and associated fittings, including air brick adaptors, clips and louvres, together with fire-rated ductwork in designated areas. The installation was coordinated to integrate with the surrounding building fabric and mechanical services.

04 / Technical scope

Project data.

System type
Residential mechanical ventilation and ducted air distribution system with fire-rated ductwork.
Ecoaer services
Installation of PVC ventilation ductwork, air brick adaptors, fixings, louvres and fire-rated ducts.
Air distribution
Air was routed through the installed PVC ductwork system, with louvres and air brick adaptors providing suitable connections and terminations to the relevant internal and external areas.
Special requirements
The project required careful coordination of the ductwork with the apartment layouts, external wall connections and fire-rated building elements. Fire duct installations also needed to maintain the required separation between designated areas.
05 / Delivery
01

Design & review

System selection, drawing review, coordination and technical input.

02

Coordination

Integration with architecture, structure, electrical, ceilings and other services.

03

Installation

Site delivery, installation, quality control and programme management.

04

Commissioning

Balancing, testing, verification, client handover and ongoing support.

06 / Outcome

“A coordinated ventilation solution delivered to specification, commissioned for performance and integrated cleanly within the finished building.”

The result.

Ecoaer delivered a coordinated residential ventilation installation incorporating PVC ductwork, external air connections and fire-rated ducting, providing a practical and integrated solution for the development.