Corporate HQ canteen, Dunstable

This state-of-the-art book printing and warehouse facility in Dunstable required an upgraded canteen comfort system, which EcoAer delivered by refurbishing and re-installing the ventilation and fan-coil cooling system.

Location
Dunstable
Sector
Office space
Client
Fulfilment Centre 
Completed
Full System
Ecoaer scope
Ventilation, Louves, diffusers, insulation
Replace with main Ecoaer project image
01 / Project overview

Engineered around the building.

Opened in 2015, the modern Dunstable facility combines large-scale warehousing with advanced book-printing operations and contemporary staff amenities, including a dedicated canteen area.

Units / zones
Office space
Project area:
DunStable
Systems installed: 
Full ventilation system
Delivery programme:
OFficial installer
02 / The brief

What the project needed.

The canteen required a reliable ventilation and cooling solution to maintain comfortable temperatures, provide fresh air and cope with changing occupancy levels during busy break periods.

03 / Ecoaer's response

How the system was delivered.

EcoAer refurbished the existing ventilation and fan-coil installation, re-installed the system and brought it back into effective operation to improve airflow and cooling within the canteen.

04 / Technical scope

Project data.

System type
Mechanical ventilation system with fan-coil cooling.
Ecoaer services
Refurbishment, re-installation and recommissioning of the canteen ventilation and fan-coil cooling system.
Air distribution
Conditioned air was distributed through the existing ventilation network, with fan-coil units providing local cooling and supporting a comfortable environment throughout the canteen.
Special requirements
Specific controls are not stated, but the system would typically use local temperature controls and fan settings to regulate cooling according to occupancy and internal conditions.
05 / Delivery
01

Design & review

System selection, drawing review, coordination and technical input.

02

Coordination

Integration with architecture, structure, electrical, ceilings and other services.

03

Installation

Site delivery, installation, quality control and programme management.

04

Commissioning

Balancing, testing, verification, client handover and ongoing support.

06 / Outcome

“A coordinated ventilation solution delivered to specification, commissioned for performance and integrated cleanly within the finished building.”

The result.

The refurbished system restored effective ventilation and cooling to the canteen, helping provide a more comfortable, well-ventilated environment for staff while extending the useful life of the existing equipment.