What the project needed.
The canteen required a reliable ventilation and cooling solution to maintain comfortable temperatures, provide fresh air and cope with changing occupancy levels during busy break periods.
This state-of-the-art book printing and warehouse facility in Dunstable required an upgraded canteen comfort system, which EcoAer delivered by refurbishing and re-installing the ventilation and fan-coil cooling system.

Opened in 2015, the modern Dunstable facility combines large-scale warehousing with advanced book-printing operations and contemporary staff amenities, including a dedicated canteen area.
The canteen required a reliable ventilation and cooling solution to maintain comfortable temperatures, provide fresh air and cope with changing occupancy levels during busy break periods.
EcoAer refurbished the existing ventilation and fan-coil installation, re-installed the system and brought it back into effective operation to improve airflow and cooling within the canteen.
System selection, drawing review, coordination and technical input.
Integration with architecture, structure, electrical, ceilings and other services.
Site delivery, installation, quality control and programme management.
Balancing, testing, verification, client handover and ongoing support.
“A coordinated ventilation solution delivered to specification, commissioned for performance and integrated cleanly within the finished building.”
The refurbished system restored effective ventilation and cooling to the canteen, helping provide a more comfortable, well-ventilated environment for staff while extending the useful life of the existing equipment.