Project / 01

Clarke's Strawberries

Supply and installation of a mechanical ventilation system for Clarke's Strawberries, incorporating high-flow heat recovery ventilation, fire-rated ceiling valves and associated air distribution components.

Location
Ireland
Sector
commercial
Client
Clarke's
Completed
ventilation installation
Ecoaer scope
Mechancial Ventilation Works
Replace with main Ecoaer project image
01 / Project overview

Engineered around the building.

Various areas throughout the development requiring mechanical ventilation and coordinated air distribution.

Units / zones
Ground floor ventilation
Project area:
Logistics
Ground floor areas
Systems installed: 
High-Flow HRV Unit & Fire-Rated Ventilation Components
Delivery programme:
Coordinated Mechanical Programme

02 / The brief

What the project needed.

The Clarke's Strawberries project required a mechanical ventilation solution for the ground floor areas of the facility, providing controlled air supply and extraction while incorporating heat recovery to support efficient operation. The specification called for a high-flow heat recovery ventilation unit, fire-rated ceiling valves and associated airflow control components. The system also needed to accommodate insulation requirements and integrate with the building's ventilation and fire safety provisions.

03 / Ecoaer's response

How the system was delivered.

Ecoaer's scope covered the supply and installation of a ground floor mechanical ventilation package centred around a high-flow heat recovery ventilation unit. The specified works included 16 fire-rated ceiling valves, supply ductwork connections, volume control dampers with actuators and 25mm insulation to the primary ductwork. The package also incorporated commissioning provisions to support system adjustment and integration with the wider building services installation.

04 / Technical scope

Project data.

System type
High-Flow Heat Recovery Ventilation (HRV)
Ecoaer services
Ventilation Supply, Installation & Commissioning
Air distribution
Insulated Ductwork with Fire-Rated Ceiling Valves
Special requirements
Fire-Rated Terminals, Airflow Control & Motorised Dampers
05 / Delivery
01

Design & review

System selection, drawing review, coordination and technical input.

02

Coordination

Integration with architecture, structure, electrical, ceilings and other services.

03

Installation

Site delivery, installation, quality control and programme management.

04

Commissioning

Balancing, testing, verification, client handover and ongoing support.

06 / Outcome

“A coordinated ventilation solution delivered to specification, commissioned for performance and integrated cleanly within the finished building.”

The result.

The specified ventilation package provided a coordinated solution for the ground floor ventilation requirements at Clarke's Strawberries. The combination of high-flow heat recovery ventilation, fire-rated air terminals and controlled ductwork distribution was designed to support effective air movement while addressing the building's operational and safety requirements. Ecoaer's scope brought together the key ventilation components, installation activities and commissioning provisions to support an efficient and practical mechanical ventilation solution.