What the project needed.
The Brighton House project required a mechanical ventilation ductwork solution to support air distribution throughout the designated building areas. The works involved a combination of circular and rectangular ductwork, with bends, transitions and connections to accommodate the building's layout. The specification also included insulation and ventilation terminals to support effective air distribution and integration with the wider ventilation system.
