02 / The brief
What the project needed.
The facility required a heavy-duty ventilation system capable of managing airflow across large industrial spaces, supporting safe working conditions and providing effective air distribution, fire protection and environmental control.
03 / Ecoaer's response
How the system was delivered.
Over two years, EcoAer installed the full ventilation package, including fans, ductwork, volume control devices, fire dampers, grilles, diffusers, louvres and insulation, coordinating the installation around the complex plant and building layout.