Beddington Energy Recovery Facility

The £205 million Beddington Energy Recovery Facility is a major 275,000-tonne waste-to-energy plant where EcoAer delivered a complete ventilation installation over a two-year programme.

Location
Dunstable
Sector
Residential
Client
Fulfilment Centre 
Completed
Full System
Ecoaer scope
Ventilation, Louves, diffusers, insulation
Replace with main Ecoaer project image
01 / Project overview

Engineered around the building.

Construction of the technically complex Beddington ERF began in 2015, creating a large industrial facility designed to recover energy from waste while requiring robust building services capable of operating reliably in a demanding process environment.

Units / zones
Industrial
Project area:
Beddington
Systems installed: 
Full ventilation system
Delivery programme:
OFficial installer
02 / The brief

What the project needed.

The facility required a heavy-duty ventilation system capable of managing airflow across large industrial spaces, supporting safe working conditions and providing effective air distribution, fire protection and environmental control.

03 / Ecoaer's response

How the system was delivered.

Over two years, EcoAer installed the full ventilation package, including fans, ductwork, volume control devices, fire dampers, grilles, diffusers, louvres and insulation, coordinating the installation around the complex plant and building layout.

04 / Technical scope

Project data.

System type
Large-scale industrial mechanical ventilation and extract system.
Ecoaer services
Full ventilation installation, including fans, ductwork, air-balancing components, fire dampers, terminal devices, louvres and insulation.
Air distribution
Air was moved through an extensive ductwork network and distributed via grilles, diffusers and louvres, with volume control devices used to regulate and balance airflow throughout the facility.
Special requirements
The technically challenging industrial environment required robust equipment, careful coordination around process machinery, reliable fire protection and an installation capable of operating continuously under demanding conditions.
05 / Delivery
01

Design & review

System selection, drawing review, coordination and technical input.

02

Coordination

Integration with architecture, structure, electrical, ceilings and other services.

03

Installation

Site delivery, installation, quality control and programme management.

04

Commissioning

Balancing, testing, verification, client handover and ongoing support.

06 / Outcome

“A coordinated ventilation solution delivered to specification, commissioned for performance and integrated cleanly within the finished building.”

The result.

EcoAer successfully completed a comprehensive ventilation system for the 275,000-tonne facility, providing controlled airflow, effective air distribution and a robust solution suited to the operational demands of a major energy recovery plant.