Project / 01

Amazon Munich

Mechanical ventilation package for an Amazon facility in Munich, incorporating cold smoke ventilation and associated air distribution infrastructure.

Location
Germany
Sector
Commercial
Client
King and Moffatt
Completed
2020
Ecoaer scope
Mechancial Ventilation Works
Replace with main Ecoaer project image
01 / Project overview

Engineered around the building.

Various areas throughout the development requiring mechanical ventilation and coordinated air distribution.

Units / zones
Multiple Ventilation Zones
Project area:
Commercial
Facilities 
Systems installed: 
Cold Smoke Ventilation Ductwork
Delivery programme:
Coordinated Mechanical Programme

02 / The brief

What the project needed.

The Amazon Munich project required a mechanical ventilation solution incorporating cold smoke ventilation to support the building's ventilation and smoke management requirements. The proposed works needed to accommodate the facility's layout and integrate with the wider mechanical services installation, with careful consideration given to ductwork distribution, system connections and coordination with other building services.

03 / Ecoaer's response

How the system was delivered.

Ecoaer prepared a mechanical ventilation package for King & Moffatt, covering the proposed ventilation works and associated project requirements. The scope included mechanical ventilation infrastructure, installation-related activities and provisions for commissioning, client instruction and handover. The proposed works were structured to support integration with the wider building services programme and provide a coordinated approach to the facility's ventilation requirements.

04 / Technical scope

Project data.

System type
Cold Smoke Ventilation System
Ecoaer services
Mechanical Ventilation Package & Commissioning Provision
Air distribution
Mechanical Ventilation Ductwork Network
Special requirements
Smoke Ventilation Integration & Building Services Coordination
05 / Delivery
01

Design & review

System selection, drawing review, coordination and technical input.

02

Coordination

Integration with architecture, structure, electrical, ceilings and other services.

03

Installation

Site delivery, installation, quality control and programme management.

04

Commissioning

Balancing, testing, verification, client handover and ongoing support.

06 / Outcome

“A coordinated ventilation solution delivered to specification, commissioned for performance and integrated cleanly within the finished building.”

The result.

The proposed mechanical ventilation package provided a structured approach to meeting the cold smoke ventilation requirements of the Amazon Munich facility. By incorporating mechanical ventilation works alongside provisions for commissioning and handover, the package was designed to support a coordinated building services installation. Ecoaer's involvement contributed to the planning and technical development of a ventilation solution tailored to the project's requirements.